Removed four, 3.5 inch studs, 4.5 inches deep at a Petro/Chem Plant near Baton Rouge, LA on Saturday & Sunday.
That’s not mud around the studs it is the metal removed by Disintegration
Traveled Monday
Removed a 5mm tap in the shop on Tuesday.
Just 4 days at CBG, LLC